Touring
The
Mount Olive Transfer Station Driving
Around
As you exit the
inbound scale you drive along the western side of
the facility. On you left your will see an
outdoor truck pit and concrete tipping
floor. This area was used when the facility
first opened in the winter of 1988 while the
building was being constructed.
As you proceed, no
faster than 5 MPH, you will curve left around the
building. You need to keep it slow because
ducks frequent the pond on your right and workers
frequent the tarp preparation area and transfer
trailer tunnel exit on your left. Continue
curving past the employee parking area on the
left and wait for instructions at the stop sign
ahead of you. When the facility's floor is
safe and available you will be instructed to back
into one of the unloading bays.
|